Come to Jinan in early December to experience traveling on Yunba
Product Overview
Jinan Yunba starts no-load trial operation, expected to be opened in early DecemberAt around 10 a.m. on August 7, a Yunba train from Jinan High-tech East District slowly drove out from Pengjiazhuang Station and headed to
Key Features
- Meet or exceed OEM requirements
- 2 years warranty
- Strict quality control
- Complete testing from material to product
Quality Assurance
Jinan Yunba starts no-load trial operation, expected to be opened in early DecemberAt around 10 a.m. on August 7, a Yunba train from Jinan High-tech East District slowly drove out from Pengjiazhuang Station and headed towards Tuhe West Road Station. Starting from now on, Jinan Yunba officially launched a three-month no-load trial operation. After the trial operation is completed, various acceptance and evaluation work will be carried out, and it is expected to be opened in early December this year. The total length of the Yunba Ring Line in Jinan is 30.55 kilometers, with 32 stations, and operates with a fully automatic unmanned driving system. After opening to traffic, it will help residents in the area solve the travel connection problem with its independent road rights, low transportation volume and flexibility and efficiency. (Volkswagen News·Dazhong Daily reporter Liu Feiyue)
| Material | High-tensile steel / forged aluminum |
|---|---|
| Finish | E-coat / powder paint / zinc plating |
| Standards | IATF / ISO-based process control |
| Warranty | 24 months |
| MOQ | 50-100 pcs per reference |
| Lead Time | 25-35 days after PO |
Compatible Brands:
Toyota, Honda, Nissan, BMW, Mercedes-Benz, Ford, Hyundai, Kia, Volkswagen, Land Rover, and more...
Request a Quote
Just for B2B inquiries, no retail please. We'll get back to you within 24 hours.

