okmad#okmadautoparts.com +86 139-6450-2388

Chengdu Metro Lines 1-4 Operating Hours ?Morning and Evening Schedule

Apr 15, 202618viewsBlogs

Product Overview

Chengdu Metro Lines 1-4 Operating Hours If you are planning a trip to Chengdu, you may be wondering about the operating hours of the city's metro lines. In this article, we will provide you with a complete guide to th

Key Features

  • Meet or exceed OEM requirements
  • 2 years warranty
  • Strict quality control
  • Complete testing from material to product

Quality Assurance

Chemical Analysis
Hardness Test
Surface Test
Dimension Check
Salt Fog Test
Fatigue Test
Fast worldwide shipping Quality guaranteed

Chengdu Metro Lines 1-4 Operating Hours

If you are planning a trip to Chengdu, you may be wondering about the operating hours of the city\'s metro lines. In this article, we will provide you with a complete guide to the operating hours of Chengdu Metro Lines 1-4, including important information such as the first and last trains, frequency of service, and ticket prices.

1. Introduction to Chengdu Metro Lines 1-4

Chengdu Metro Lines 1-4 are some of the busiest and most important lines in the city\'s metro system. Line 1 runs from Shengxian Lake in the north to Guangdu in the south, passing through the city center and connecting to major transportation hubs such as Chengdu Railway Station and Chengdu East Railway Station. Line 2 runs from Xipu in the west to Longquanyi in the east, passing through the city center and connecting to important tourist attractions such as Chunxi Road and Wuhou Temple. Line 3 runs from Taipingyuan in the north to Chengdu Junqu General Hospital in the south, passing through the city center and connecting to major shopping areas such as Chunxi Road and Tianfu Square. Line 4 runs from Wansheng in the north to Intangible Cultural Heritage Park in the south, passing through the city center and connecting to important business districts such as Century City and High-Tech Zone.

2. First and Last Trains

The first and last trains of Chengdu Metro Lines 1-4 vary depending on the station and the direction of travel. Generally, the first trains begin running at around 6:00 am, while the last trains stop running at around 11:00 pm. However, it is important to note that these times may vary depending on the day of the week and whether it is a holiday or not.

3. Frequency of Service

The frequency of service on Chengdu Metro Lines 1-4 varies depending on the time of day and the day of the week. During peak hours, trains may run as frequently as every 2-3 minutes, while during off-peak hours, trains may r

MaterialHigh-tensile steel / forged aluminum
FinishE-coat / powder paint / zinc plating
StandardsIATF / ISO-based process control
Warranty24 months
MOQ50-100 pcs per reference
Lead Time25-35 days after PO
Passenger Cars
SUVs & Pickups
Commercial Vehicles
Off-road Vehicles

Compatible Brands:

Toyota, Honda, Nissan, BMW, Mercedes-Benz, Ford, Hyundai, Kia, Volkswagen, Land Rover, and more...

Request a Quote

Just for B2B inquiries, no retail please. We'll get back to you within 24 hours.

Phone+86 139-6450-2388
WhatsApp+86 139-6450-2388
Tags: