okmad#okmadautoparts.com +86 139-6450-2388

How to disassemble the Changan Yuexiang throttle valve, and how to clean the Yuexiang throttle valve

Apr 21, 202617viewsBlogs

Product Overview

Chang'anYuexiangThe method of removing the throttle valve is as follows:1. Before starting, you need to wait for the machine to cool down before starting the following steps. It is not that hot machines cannot be clea

Key Features

  • Meet or exceed OEM requirements
  • 2 years warranty
  • Strict quality control
  • Complete testing from material to product

Quality Assurance

Chemical Analysis
Hardness Test
Surface Test
Dimension Check
Salt Fog Test
Fatigue Test
Fast worldwide shipping Quality guaranteed

Chang'anYuexiangThe method of removing the throttle valve is as follows:

1. Before starting, you need to wait for the machine to cool down before starting the following steps. It is not that hot machines cannot be cleaned. The main thing is to protect your little hands from being burned.

2. Remove the car key, open the engine compartment cover, and support it well.

3. Remove the negative cable of the battery. It must be removed, otherwise it will be difficult to correct the car's motherboard after cleaning.

4. Remove the plastic engine cover

5. Use a screwdriver to loosen the clamp screw on the air intake pipe and pull out the air intake pipe.

6. Remove the three fixing screws of the throttle valve.

7. Unplug the cooling water pipe of the throttle valve and be careful not to drip cooling water into the intake manifold.

8. Loosen the throttle cable screw (throttle cable), remove the throttle cable, and unplug the throttle control cable and idle motor cable

9. You can clearly see that the front circle of the air intake adjustment plate is dark.

10. After cleaning is completed, install it in the reverse order of disassembly;

11. Check whether the installation of all components is complete. After completion, connect the negative wire of the battery;

12. Perform throttle calibration on the c

MaterialHigh-tensile steel / forged aluminum
FinishE-coat / powder paint / zinc plating
StandardsIATF / ISO-based process control
Warranty24 months
MOQ50-100 pcs per reference
Lead Time25-35 days after PO
Passenger Cars
SUVs & Pickups
Commercial Vehicles
Off-road Vehicles

Compatible Brands:

Toyota, Honda, Nissan, BMW, Mercedes-Benz, Ford, Hyundai, Kia, Volkswagen, Land Rover, and more...

Request a Quote

Just for B2B inquiries, no retail please. We'll get back to you within 24 hours.

Phone+86 139-6450-2388
WhatsApp+86 139-6450-2388
Tags: